Size: 31 boxes, (10.25 cu.ft.) and 2 oversized boxes, (total of 12.25 cu.ft.)
Box 2
| F. 1 |
1985-88 |
Barton Hall Addition 1985/87 Appropriations - Change Orders |
| F. 2 |
1985 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #1 (part 1) |
| F. 3 |
1985 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #1 (part 2) |
| F. 4 |
1983-85 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #1 (part 3) |
| F. 5 |
1985 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #2 from 5/1/85 (part 1) |
| F. 6 |
1985 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #2 from 5/1/85 (part 2) |
| F. 7 |
1985 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #2 from 5/1/85 (part 3) |
| F. 8 |
1985-86 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #3 from 10/1/85 (part 1) |
Box 8
| F. 1 |
1974-82 |
Energy Implementation - Phase I, construction punch list |
| F. 2 |
1982-84 |
Energy Improvement - Phase I, Change Orders |
| F. 3 |
1981-83 |
Energy Improvement - Phase II, Budget |
| F. 4 |
1982-83 |
Energy Improvement - Phase II, Construction Meeting Notes |
| F. 5 |
1981-82 |
Energy Improvement - Phase II, Corr. #1 prior to notice/proceed (part 1) |
| F. 6 |
1981-82 |
Energy Improvement - Phase II, Corr. #1 prior to notice/proceed (part 2) |
| F. 7 |
1981-82 |
Energy Improvement - Phase II, Corr. #2 from notice/proceed 2/11/82 (part 1) |
| F. 8 |
1982 |
Energy Improvement - Phase II, Corr. #2 from notice/proceed 2/11/82 (part 2) |
| F. 9 |
1982 |
Energy Improvement - Phase II, Corr. #3 |
Box 9
| F. 1 |
1982-85 |
Energy Improvement - Phase II, Corr. #3 |
| F. 2 |
1980-85 |
Energy Improvement - Phase III, Asbestos Removal |
| F. 3 |
1983 |
Energy Improvement - Phase III, Change Orders #1 |
| F. 4 |
1983-84 |
Energy Improvement - Phase III, Change Orders #1 |
| F. 5 |
1983-84 |
Energy Improvement - Phase III, Change Orders #1 |
| F. 6 |
1984 |
Energy Improvement - Phase III, Change Orders #2 |
| F. 7 |
1984 |
Energy Improvement - Phase III, Change Orders #2 |
| F. 8 |
1984 |
Energy Improvement - Phase III, Change Orders #2 |
| F. 9 |
1984 |
Energy Improvement - Phase III, Change Orders #2 |
| F.10 |
1984 |
Energy Improvement - Phase III, Change Orders #2 |
| F.11 |
1984-85 |
Energy Improvement - Phase III, Change Orders #2 |
Box 10
| F. 1 |
1984-85 |
Energy Improvement - Phase III, Change Orders #3 |
| F. 2 |
1985-87 |
Energy Improvement - Phase III, Change Orders #3 |
| F. 3 |
1985-88 |
Energy Improvement - Phase III, Change Orders #3 |
| F. 4 |
1985-86 |
Energy Improvement - Phase III, Corrections |
| F. 5 |
1986-88 |
Energy Improvement - Phase III, Corrections |
| F. 6 |
1980-83 |
Energy Improvement - Phase III, Corr. #1 prior notice/proceed |
| F. 7 |
1981-83 |
Energy Improvement - Phase III, Corr. #1 prior notice/proceed |
| F. 8 |
1983-84 |
Energy Improvement - Phase III, Corr. #2 from notice/proceed 5/8/83 |
Box 11
| F. 1 |
1983-84 |
Energy Improvement - Phase III, Corr. #2 from notice/proceed 5/8/83 |
| F. 2 |
1982-84 |
Energy Improvement - Phase III, Corr. #3 from notice/proceed 4/1/84 |
| F. 3 |
1983-84 |
Energy Improvement - Phase III, Corr. #3 from notice/proceed 4/1/84 |
| F. 4 |
1979-85 |
Energy Improvement - Phase III, Corr. #4 from notice/proceed 1/1/85 |
| F. 5 |
1983-87 |
Energy Improvement - Phase III, Corr. #4 from notice/proceed 1/1/85 |
| F. 6 |
1982-84 |
Energy Improvement - Phase III, Meeting Notes |
| F. 7 |
1984 |
Energy Improvement - Phase III, Meeting Notes |
| F. 8 |
1985-86 |
Energy Improvement - Phase I, II, III, Energy Audit |
| F. 9 |
1978-86 |
Energy Improvement - Phase I, II, III, Schematic and working drawings, 1978 Appropriations - Design Phase (part 1) |
Box 12
| F. 1 |
1978-81 |
Energy Improvement - Phase I, II, III, Schematic and working drawings, 1978 Appropriations - Design Phase (part 2) |
| F. 2 |
1979-81 |
Energy Improvement - Phase I, II, III, Walter's stuff |
| F. 3 |
1979 |
Energy Recovery Incineration |
| F. 4 |
1979 |
Energy Recovery Incineration |
| F. 5 |
1979-81 |
Energy Recovery Incineration |
| F. 6 |
1989-90 |
Energy Services - Staff Meeting Minutes |
| F. 7 |
1976-79 |
Fire Station (part 1) |
| F. 8 |
1976-79 |
Fire Station (part 2) |
| F. 9 |
1980-82 |
Fire Station |
| F.10 |
1983-86 |
Fire Station Relocation |
Box 13
| F. 1 |
1988 |
Food Service Warehouse Expansion - Asbestos Removal |
| F. 2 |
1988 |
Food Service Warehouse Expansion - Asbestos Removal |
| F. 3 |
1989 |
Food Service Warehouse Expansion - Asbestos Removal |
| F. 4 |
1988-89 |
Food Service Warehouse Expansion - Asbestos Removal: Submittals, Industrial Hygiene Services of N.E. |
| F. 5 |
1988-90 |
Food Service Warehouse Expansion - Change Orders #1 |
| F. 6 |
1988-89 |
Food Service Warehouse Expansion - #2 from NTP 4/23/88 |
| F. 7 |
1988-89 |
Food Service Warehouse Expansion - #2 from NTP 4/23/88 |
| F. 8 |
1989 |
Food Service Warehouse Expansion - #3 from NTP 4/1/89 |
| F. 9 |
1989 |
Food Service Warehouse Expansion - #3 from NTP 4/1/89 |
Box 15
| F. 1 |
1988 |
Food Service Warehouse Expansion - Quality Control Testing & Inspection, Corr. |
| F. 2 |
1988 |
Food Service Warehouse Expansion - Quality Control Testing & Inspection, Reports |
| F. 3 |
1988-89 |
Food Service Warehouse Expansion - Quality Control Testing & Inspection, Reports |
| F. 4 |
1987 |
Geography Dept. |
| F. 5 |
1987-88 |
Hamilton Smith |
| F. 6 |
1982 |
Health Studies Consolidation |
| F. 7 |
1980 |
Health Studies/Arts - Garage #2 & Paul Creative Arts Bldg. Contract with Page/Michaelis/Associates |
| F. 8 |
1980 |
Health Studies/Arts - Printing & Mailing Facility, Contract with Philip S. Tambling, Architect |
| F. 9 |
1986 |
Health Studies & the Arts |
| F.10 |
1980-84 |
Health Studies & the Arts - Hewitt Hall Renovations, Architects workshop |
| F.11 |
1982 |
Health Studies & the Arts - Preliminary Design & Selected Working Drawings |
| F.12 |
1982 |
Health Studies & the Arts & Physical Plant Health Studies Consolidation, Proposal for |
| F.13 |
1985-87 |
Health Studies & the Arts - Sculpture Lab, Phase II - Page, Michaelis, Rudolph #1 |
| F.14 |
1981-83 |
Health Studies & the Arts - Garages 2,3,4 (Sculpture Lab) Page/Michaelis Corr. #1 |
| F.15 |
1980-87 |
Health Studies & the Arts - Garages 2,3,4 (Sculpture Lab) Page/Michaelis Corr. #1 |
Box 16
| F. 1 |
1984-87 |
Health Studies & the Arts - Garages 2,3,4 (Sculpture Lab) Page/Michaelis Corr. #2 |
| F. 2 |
1984-87 |
Health Studies & the Arts - Garages 2,3,4 (Sculpture Lab) Page/Michaelis Corr. #2 |
| F. 3 |
1984-87 |
Health Studies & the Arts - Garages 2,3,4 (Sculpture Lab) Page/Michaelis Corr. #2 |
| F. 4 |
1984-85 |
Health Studies & the Arts - Garages 2,3,4 (Sculpture Lab) Meeting Notes |
| F. 5 |
1985-86 |
Health Studies & the Arts - Leavitt Service Center, Banwell, White & Arnold #1 |
| F. 6 |
1979-84 |
Health Studies & the Arts - Leavitt Service Center, Banwell, White & Arnold #2 |
| F. 7 |
1980-81 |
Health Studies & the Arts - Printing & Mailing Facility |
| F. 8 |
1984 |
Health Studies & the Arts - Vehicle Maintenance Relocation, Change Orders |
| F. 9 |
1982-84 |
Health Studies & the Arts - Vehicle Maintenance Relocation: Banwell, White, Arnold, Hemberger |
| F.10 |
1982-84 |
Health Studies & the Arts - Vehicle Maintenance Relocation: Banwell, White, Arnold, Hemberger |
Box 19
| F. 1 |
1988-90 |
Hood House - Institute on Disabilities |
| F. 2 |
1988-91 |
Hood House - Institute for Policy & Social Science |
| F. 3 |
1989-90 |
Hood House - UNH Polling Program |
| F. 4 |
1989-91 |
Hood House - University Club |
| F. 5 |
1982-87 |
Housing |
| F. 6 |
1982-87 |
Housing |
| F. 7 |
1980-81 |
Housing microfilmed 1986 #2 |
| F. 8 |
1982-86 |
Housing microfilmed 1986 #3 |
| F. 9 |
1982-83 |
Housing microfilmed 1986 #3 UNH Undergraduate residences, Eckman Construction Co. Project Manual |
| F.10 |
1983-84 |
Housing microfilmed 1986 #4 |
| F.11 |
1983-84 |
Housing microfilmed 1986 #4 |
Box 20
| F. 1 |
1980 |
Incinerator - Town/Gown Feasibility Study, Town Report, Agreement/Engineer., UNH letter/Int. Prel. Site Planning |
| F. 2 |
1987 |
Institute for Leadership & Organizational Renewal - Moe Olivier |
| F. 3 |
1987-88 |
Johnson Theater |
| F. 4 |
1985-86 |
Kingsbury Hall Roof |
| F. 5 |
1985-86 |
Kingsbury Hall Roof |
| F. 6 |
1978 |
Lamprey Regional Solid Waste Cooperative |
| F. 7 |
1982 |
Letter from Roger Knightly to Gary W. Wulf |
| F. 8 |
1981-82 |
Life Safety/Handicapped Accessibility Improvements #1 old |
| F. 9 |
1981-82 |
Life Safety/Handicapped Accessibility Improvements #1 old |
| F.10 |
1982-83 |
Life Safety/Handicapped Accessibility Improvements, from notice to proceed #2 |
| F.11 |
1983 |
Life Safety/Handicapped Access. Improvements #3 |
| F.12 |
1983-85 |
Life Safety/Handicapped Access. Improvements #3 |
| F.13 |
1983 |
Life Safety/Handicapped Accessibility Improvements- Code, Change Orders |
Box 21
| F. 1 |
1982-83 |
Life Safety/Handicapped Accessibility Improvements - Meeting Notes |
| F. 2 |
1983-87 |
Long Term Capital Improvement Program |
| F. 3 |
1986 |
Marine Lab |
| F. 4 |
1985-88 |
MGT of America, Inc.'s Analysis of Facility Needs and Evaluation of Current Facilities of UNH |
| F. 5 |
1988-91 |
MGT of America, Inc.'s Analysis of Facility Needs and Evaluation of Current Facilities of UNH |
| F. 6 |
1988 |
MGT of America, Inc.'s "An Analysis of the Higher Education Facility Needs in New Hampshire" |
| F. 7 |
1984-85 |
Mill Road Improvement |
| F. 8 |
1984-86 |
Miscellaneous Campus Funded Projects |
| F. 9 |
1981-84 |
National Science Foundation Grant #ATM-8109545 Budget 1983 & NSF #ATM-8311241 |
| F.10 |
1981-82 |
Nesmith Hall - Change Order |
Box 24
| F. 1 |
1986 |
Residential Life |
| F. 2 |
1989-91 |
Rosenberg Properties |
| F. 3 |
1986 |
Satellite Receiving Dish |
| F. 4 |
1985 |
Seabrook Evacuation Host Plan |
| F. 5 |
1990-91 |
Smith Hall - Budgets |
| F. 6 |
1991 |
Smith Hall - Hazardous Materials Survey |
| F. 7 |
1991 |
Smith Hall - Lavallee/Brensinger Professional Association Contracts & Insurance Documents |
| F. 8 |
1991 |
Smith Hall - Northeast Test Consultants Proposal for Industrial Hygiene & Asbestos Management Services |
| F. 9 |
1984-90 |
Smith Hall Renovation: Budget, Smith Hall Program Committee Meeting Notes, Architectural Info. |
| F.10 |
1991 |
Smith Hall Renovation: Budget, Smith Hall Program Committee Meeting Notes, Architectural Info. |
| F.11 |
1991 |
Smith Hall Renovations - Master Outline Specifications & Final Schematic Design Package |
| F.12 |
1984-85 |
Smoke Detectors - 1984 Law |
Box 26
| F. 1 |
1985-89 |
Stoke Hall |
| F. 2 |
1986-88 |
Student Affairs |
| F. 3 |
1989-90 |
Student Apartment Complex (SAC) - Liquidated Damages |
| F. 4 |
1988-89 |
Student Apartment Complex - Preliminary Studies |
| F. 5 |
1990 |
Student Apartment Complex - Prequalification of Bidders |
| F. 6 |
1988-90 |
Student Apartment Complex - Program |
| F. 7 |
1990 |
Student Apartment Complex - Sewer & Water |
| F. 8 |
1988-90 |
Student Apartment Complex - Suffolk Construction Co., Inc. |
| F. 9 |
1990 |
Student Apartment Complex - Suffolk Construction Co., Inc. |
| F.10 |
1986-88 |
TASK Center Space |
| F.11 |
1984-85 |
Technology Research Park Study |
| F.12 |
1985 |
Thermal Systems, UNH Durham, NH Completion Report |
| F.13 |
1990-91 |
Town/Gown Advisory Committee |
| F.14 |
1989-91 |
Transportation Committee Minutes |
| F.15 |
1983 |
Undergraduate Apartment Complex (UAC) also known as: New Undergraduate Residences Development #0169 |
Box 28
| F. 1 |
1983 |
UAC Undergraduate Apartment Complex - Concrete, Correspondence 03000 |
| F. 2 |
1983 |
UAC - Concrete Testing 03000 |
| F. 3 |
1983 |
UAC - Contracts |
| F. 4 |
1980-82 |
UAC - Correspondence, Phase I |
| F. 5 |
1982-85 |
UAC - Correspondence, Phase II |
| F. 6 |
1982-85 |
UAC - Correspondence, Phase II |
| F. 7 |
1983 |
UAC - Correspondence Development, Phase II |
| F. 8 |
1982-83 |
UAC - Design Evaluation, New Dorm Plan Review 3/28 & 29/83 |
| F. 9 |
1982-83 |
UAC - Design Evaluation, New Dorm Plan Review 3/28 & 29/83 |
| F.10 |
1983 |
UAC - Doors and Windows |
| F.11 |
1983 |
UAC - Earthwork for Builders 02200 |
Box 31
| F. 1 |
1983 |
UAC - Specialties 10,000 |
| F. 2 |
1983 |
UAC - Specialties |
| F. 3 |
1982 |
UAC - Topographical Survey |
| F. 4 |
1983-84 |
UAC - Town |
| F. 5 |
1983 |
UAC - Wood and Plastics 06000 |
| F. 6 |
1985 |
USNH Office, Relocation of, Project #8527 |
| F. 7 |
1976-84 |
University of Maryland |
| F. 8 |
1983-85 |
WENH TV Tower Contract, Saddleback Mountain, LeBlanc & Royle |
| F. 9 |
1983 |
WENH TV Contract, Transmitter Station, Flecchia Engineering |
| F.10 |
1983-84 |
WENH TV Contract, Office Renovations - MUB, JSA Inc. |
| F.11 |
1979 |
Vanderweil Report on Univ. of NH, Low Temp. Hot Water Thermal Distribution System Schematic Design |
| F.12 |
1981 |
Vanderweil Report on UNH, Thermal Distribution Systems Energy Improvements Phase II & III revised |
| F.13 |
1981 |
Vanderweil Report on UNH, Thermal Distribution Systems Energy Improvements Phase II & III revised |
| F.14 |
1984-88 |
Ventilation Requirements |
| F.15 |
1985 |
West of the Tracks |
Oversized Box 1
| F. 1 |
1983 |
Ballard Street Project Map |
| F. 2 |
1981-83 |
Barton Hall 1981 Appropriation |
| F. 3 |
1983-85 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #1 |
| F. 4 |
1985 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #1 (part 1) |
| F. 5 |
1985 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #1 (part 2) |
| F. 6 |
1985 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #1 (part 3) |
| F. 7 |
1985 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #2 from 5/1/85 (part 1) |
| F. 8 |
1985 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #2 from 5/1/85 (part 3) |
| F. 9 |
1985-86 |
Barton Hall Addition 1985/87 Appropriations - Correspondence #3 from 10/1/85 (part 1) |
| F.10 |
1987 |
Barton Hall Addition 1985/85 Appropriations - Correspondence #5 from 1/1/87 |
| F.11 |
1981-82 |
Barton Hall Topographical Survey and Subsurface Borings |
| F.12 |
1984 |
Conant Hall - Correspondence #2 from notice/proceed; attached to letter from Page Michaelis Rudolph dated 12 June 1984 |
| F.13 |
1981-81 |
Energy Improvement - Phase II, Correspondence #1 prior to notice/proceed; attached to letter from Charles Stein to Vincent E. Todd dated 23 February 1981 |
| F.14 |
1981-82 |
Energy Improvement - Phase II, Correspondence #2 from prior notice/proceed 2/11/81 (part 1) |
| F.15 |
1982 |
Energy Improvement - Phase II, Correspondence #3 |
| F.16 |
1980-83 |
Energy Improvement - Phase III, Correspondence #1 prior to notice/proceed |
| F.17 |
1985-88 |
Energy Improvement - Phase III, Corrections |
| F.18 |
1983-87 |
Energy Improvement - Phase III, Correspondence #4 from notice/proceed 1/1/85; attached to letter from Gerry Tremain to Mr. Kevin L. Clavin dated 30 July 1986 |
| F.19 |
1978-86 |
Energy Improvement - Phase I,II,III Schematic and Working Drawings, 1978 Appropriations - Design Phase (part 1) |
| F.20 |
1978-86 |
Energy Improvement - Phase I,II,III Schematic and Working Drawings, 1978 Appropriations - Design Phase (part 2) |
| F.21 |
1978-81 |
Energy Recovery Incineration |
| F.22 |
1979-81 |
Energy Recovery Incineration; attached to campus correspondence letter from Nicholas Plebani to Allan Prince dated 14 January 1980 |
| F.23 |
1983-86 |
Fire Station Relocation |
| F.24 |
1989 |
Food Service Warehouse Expansion - #4 from NTP 7/1/89 |
| F.25 |
1990 |
Food Service Warehouse Expansion - #5 from NTP 1/1/90; attached to letter of transmittal from Corzilius Matuszewski Krause Architects dated 1/29/90 |
| F.26 |
1985-87 |
Food Service Warehouse Expansion |
| F.27 |
1985-87 |
Food Service Warehouse Expansion; attached to letter of transmittal from UNH Architectual Services Department to Gerry Ruffner dated 23 December 1987 |
| F.28 |
1982 |
Health Studies and the Arts - Preliminary Design and Selected Working Drawings; attached to campus correspondence from Pat Miller to Skip DeVito dated 18 May 1983 |
| F.29 |
1985-87 |
Health Studies and the Arts Sculpture Lab, Phase II - Page, Michaelis, Rudolph #1 |
| F.30 |
1981-83 or 1980-87 |
Health Studies and the Arts Garages 2,3,4 (Sculpture Lab) Page/Michaelis Correspondence #1; attached to letter from Barbara Lindsay to Page/Michaelis Association |
| F.31 |
1982-84 |
Health Studies and the Arts - Vehicle Maintenance Relocation: Banwell, White, Arnold, Hemberger |
Oversized Box 2
| F. 1 |
1972-81 |
New Health Facility (Hood House) |
| F. 2 |
1987-91 |
Hood House |
| F. 3 |
1970-80 |
Hood House - Alterations and Renovations, John Benson #1 |
| F. 4 |
1980 |
Incinerator - Town/Gown Feasibility Study, Town Report, Agreement/Engineer, UNH Letter/Int. Prel. Site Planning |
| F. 5 |
1982-83 |
Life Safety/Handicapped Accessibility Improvements - from notice to proceed #2 |
| F. 6 |
1986 |
Marine Lab |
| F. 7 |
1970-86 |
Spaulding Animal Rooms #1764 |
| F. 8 |
1984-89 |
Stillings Dining Hall Roof |
| F. 9 |
1985-89 |
Stoke Hall |
| F.10 |
1986-88 |
TASk Center Space |
| F.11 |
1985 |
USNH Office, Relocation of, Project #8527 |
| F.12 |
1983 |
Undergraduate Apartment Complex (UAC) Graphics |
| F.13 |
1983-84 |
UAC - Site Evaluation |
| F.14 |
1982 |
UAC - Topographical Survey |
| F.15 |
1981 |
Vanderweil Report on UNH Thermal Distribution Systems Energy Improvements Phase II and III, Revised 2/11/81 |